Hi,
The cost element validity period from 01.01.2014 to 31.12.2014 Now i want to extend this cost element validity period.
And when i extend the validity period from 01.01.2014 to 31.12.2015 i am facing this error like " New analysis period must not exceed maximum period limit"
Please help me to fix this error and find the error screen for reference.
Regards,
Babu