Dear Experts
Need your support pls...
I want to create a purchasing contract(me31k) for an item with vendor. Scenario is like this, purchase price of material X have 2 price as P1 & P2 because if material X required through a process route hot Rolled then price is P1 but material X required with process route hot rolled and Anneling then price is P2.
Even price P1 can also be change if X material-->Hot rolled but dia is in between 5 mm to 30 mm then price of X material will be P1-1, but dia is 31 mm to 90mm then price is P1+2 and same scenario with material which is hot rolled & anneled of price P2 mean if material dia is between 5 mm to 30mm then price P2-1 but dia 31- 90 mm, price P2+2
How can i do..pls help
Regards
Mohit